Prosperidade I Thermal Power Plant

Sector: Government • Location: Brazil

Source: World Bank Group

Project
Active

The Brazilian company Imetame Energia was granted the authorization to build and operate a natural-gas fueled power plant located in the state of Bahia, municipality of Camacari (28 MW in total capacity). The power plant was named UTE Prosperidade I. A 35-year authorization contract was granted by the regulatory agency ANEEL in April 2016. In July 2017, the authorization was transferred to Imetame

Project Information FAQ

Project Information

5 Q
The project “Prosperidade I Thermal Power Plant” is an infrastructure initiative in the Government sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Brazilian company Imetame Energia was granted the authorization to build and operate a natural-gas fueled power plant located in the state of Bahia, municipality of Camacari (28 MW in total capacity). The power plant was named UTE Prosperidade I. A 35-year authorization contract was granted by the regulatory agency ANEEL in April 2016. In July 2017, the authorization was transferred to Imetame Termeletrica Ltda. The investment committed to the power plant was estimated at US$ 29.4 million (BRL 93.306 million). Financial closure was achieved in early 2017, when the sponsor was granted a loan from the German bank LBBW and the Finnish development bank Finnvera. The amount of the loan was not disclosed. Construction works commenced in January 2017 and were in its final stages as of June 2017. The construction works at the UTE Prosperidade I commenced in March 2017, and operations were expected to begin in early 2018. The government periodically runs public bidding for the sale of energy to the country´s distribution companies. UTE Prosperidade I won the public bidding that took place in August 2015 by offering an average tariff of US$ 64.2/MWh (BRL 214.25/MWh). The project company signed 20-year power purchase agreements with the several electricity distribution companies.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data