Prosperity Elementary School 8 Classroom Addition
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge USA
Site and Utility work to include demolition and removal of 6 existing modular classroom buildings; disconnection, termination, removal/relocation of existing site utilities; misc. site and building demolition; earthwork, grading and site clearing; site utilities; site electrical, fire alarm and data; site concrete (patch back) and asphalt paving (patch back) and other work as indicated in the cont
- Status
- Closed
- Sector
- Road, Cement, Power Transmission, Commercial, Power Generation (CCGT), Government, Education, Manufacturing (Industrial)
- Location
- Bakersfield, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Prosperity Elementary School 8 Classroom Addition
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Site and Utility work to include demolition and removal of 6 existing modular classroom buildings; disconnection, termination, removal/relocation of existing site utilities; misc. site and building demolition; earthwork, grading and site clearing; site utilities; site electrical, fire alarm and data; site concrete (patch back) and asphalt paving (patch back) and other work as indicated in the contract documents |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Bakersfield |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Cement, Power Transmission, Commercial, Power Generation (CCGT), Government, Education, Manufacturing (Industrial) |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
