logo
ProjectEnded

Protocol for heavy duty hydrogen refuelling

The status, timeline and source of this project. A free account opens every field.

Source: EU Funding & Tenders Portal

The objective of the proposal is to build the foundations of non-proprietary heavy duty refueling protocols for large tank systems (larger than 10kg), such as the ones found in heavy duty hydrogen applications. The consortium of PrHyde involves all the types of stakeholders linked with hydrogen HD refuelling. It and is therefore well suited to take end user needs, learnings from existing light dut

Status
Closed
Sector
Power Generation (CCGT), Hydrogen
Location
Germany, France, Belgium, United Kingdom, Denmark, United States
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about Protocol for heavy duty hydrogen refuelling

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Protocol for heavy duty hydrogen refuelling” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Germany, France, Belgium, United Kingdom, Denmark, United States. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ended

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the proposal is to build the foundations of non-proprietary heavy duty refueling protocols for large tank systems (larger than 10kg), such as the ones found in heavy duty hydrogen applications. The consortium of PrHyde involves all the types of stakeholders linked with hydrogen HD refuelling. It and is therefore well suited to take end user needs, learnings from existing light duty protocols, learnings from the field, requirements for heavy duty applications, existing prior work (e.g. HyTransfer), considerations for improvements and requirements for safety into account and combine those into a proposal for a protocol that meets long term customer needs. Key metrics are refueling time, potential for cost reduction and ease of use. Although the consortium is formed by a large variety of companies, further partners are involved through a series of workshops to make sure the wider industry perspective is captured. The protocol to be developed is validated by simulation and experimental work on single tanks and multi-tank systems, showing that the proposed protocol works as intended and the understanding of thermodynamic effects on large, multi-vessel systems is adequate. Performance specifications for components and application-to-infrastructure communications are a planned by-product of the project. The results of the project will be used to develop an international standard for wide reach and adaptation outside of the project scope. The work will enable the widespread deployment of hydrogen for heavy duty applications, such as trucks, trains, etc. but also transport systems. The results are both a valuable guidance for station design, but also the prerequisite for the deployment of a standardized, cost effective infrastructure. To maximize impact, solutions are developed for pressure levels of 35MPa, 50MPa and 70MPa and non-gaseous storage options are analyzed and benchmarked against current state of the art storage and refueling performance.

Location

Country

Germany, France, Belgium, United Kingdom, Denmark, United States

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydrogen

Article published date

2026-02-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project