logo
ProjectBid Results

Provincial Building HVAC Upgrades

Sector: Commercial • Location: Red Deer, Alberta, Canada

Source: Dodge USA

.1 Replacement of the existing chiller .2 Replacement of 3 supply and 4 return fan motors. .3 Replacement of motorized dampers and actuators on 5 air handling systems. .4 Addition of cyclone separator. .5 Replacement of 2 control air compressors .6 Addition of new refrigerant detection system .7 Replacement of expansion tank .8 Replacement of chilled water and condenser water pumps. .9 Replacement

Status
Closed
Sector
Commercial, Water Supply and Storage, Residential, Road, Manufacturing (Industrial)
Location
Red Deer, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Provincial Building HVAC Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Provincial Building HVAC Upgrades” is an infrastructure initiative in the Commercial sector, located in Red Deer, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

.1 Replacement of the existing chiller .2 Replacement of 3 supply and 4 return fan motors. .3 Replacement of motorized dampers and actuators on 5 air handling systems. .4 Addition of cyclone separator. .5 Replacement of 2 control air compressors .6 Addition of new refrigerant detection system .7 Replacement of expansion tank .8 Replacement of chilled water and condenser water pumps. .9 Replacement of existing controls for the chilled water system involving chiller replacement.

Procurement method

Location

Country

Canada

State

Alberta

City

Red Deer

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Residential, Road, Manufacturing (Industrial)

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project