logo

PROVINC.W.S.

Sector: Water Supply and Storage • Location: Philippines

Source: World Bank Group

Project
Closed

Project components include: (i) Baguio Water District: Rehabilitation of Buyog Spring and Santo Thomas Reservoir. Well field with pumping station. Thirteen km of transmission pipelines and two storage tanks with a booster pumping station. One hundred ten km of distribution pipelines and the rehabilitation of the kilometer 8 storage tank. (ii) Cabanatuan Water District: Rehabilitation of two existi

Project Information FAQ

Project Information

5 Q
The project “PROVINC.W.S.” is an infrastructure initiative in the Water Supply and Storage sector, located in Philippines. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Project components include: (i) Baguio Water District: Rehabilitation of Buyog Spring and Santo Thomas Reservoir. Well field with pumping station. Thirteen km of transmission pipelines and two storage tanks with a booster pumping station. One hundred ten km of distribution pipelines and the rehabilitation of the kilometer 8 storage tank. (ii) Cabanatuan Water District: Rehabilitation of two existing wells and the construction of a new well field. Construction of two storage tanks or of additional wells to meet peak hour demand. Fifty km of distribution pipelines. (iii) Lipa Water District: Rehabilitation of two existing wells and a storage tank, and the construction of a well field. Thirty km of distribution pipelines. (iv) Lucena-Pagbilao-Tayabas Water District. Expansion and improvements to May-it Spring intake works and the contruction of 8 km of transmission pipelines. Two storage tanks, rehabilitation of the Tongko storage tanks, and 8 km of pipelines. Fifty km of distribution pipelines. (v) San Fernando (La Union) Water District: Six wells in the Bauang and Baroro river banks with 35 km of transmission and distribution pipelines. (iv) Tarlac Water District: Rehabilitation of two existing wells and the construction of a new well field.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data