logo

Provision of Centralised Control system with Electronic Interlocking/Interface & Block optimisation system in Automatic Block Signalling in connection with Modern Train Control system on GQ & GD routes on 203 RKM of Southern Railway

Sector: Mass Transit • Location: Chennai, Tamil Nadu, India

Source: India Investment Grid (IIG)

Project
Dpr Approved

Information Indian Railway has come up with Provision of Centralised Control system with Electronic Interlocking/Interface & Block optimisation system in Automatic Block Signalling in connection with Modern Train Control system on GQ & GD routes on 203 RKM of Southern Railway with a ticket size of 140.33 INR Crores. This project in Railway Rolling Stock sub-sector involves Centralised Traffic Cont

Project Information FAQ

Project Information

5 Q
The project “Provision of Centralised Control system with Electronic Interlocking/Interface & Block optimisation system in Automatic Block Signalling in connection with Modern Train Control system on GQ & GD routes on 203 RKM of Southern Railway” is an infrastructure initiative in the Mass Transit sector, located in Chennai, Tamil Nadu, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

dpr approved

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Indian Railway has come up with Provision of Centralised Control system with Electronic Interlocking/Interface & Block optimisation system in Automatic Block Signalling in connection with Modern Train Control system on GQ & GD routes on 203 RKM of Southern Railway with a ticket size of 140.33 INR Crores. This project in Railway Rolling Stock sub-sector involves Centralised Traffic Control System The current status of the project is DPR Approved and is being developed through the EPC route.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data