logo
ProjectBid Results

PRV Station Replacement Phase 1

Bid results · Washington · Last reported Mar 2024

Source: Dodge USA

Work to be performed under this contract includes, but is not limited to furnishing all labor, equipment, and materials necessary for demolition or abandonment of four existing pressure reducing valve stations, construction of four new pressure reducing valve stations and associated appurtenances including 6-inch through 12-inch connections to existing water mains, a timber pedestrian staircase wi

Status
Closed
Sector
Forest Products and Packaging, Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
Location
Mercer Island, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about PRV Station Replacement Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “PRV Station Replacement Phase 1” is an infrastructure initiative in the Forest Products and Packaging sector, located in Mercer Island, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work to be performed under this contract includes, but is not limited to furnishing all labor, equipment, and materials necessary for demolition or abandonment of four existing pressure reducing valve stations, construction of four new pressure reducing valve stations and associated appurtenances including 6-inch through 12-inch connections to existing water mains, a timber pedestrian staircase with handrails, domestic and irrigation water services, storm pipe with catch basin connections, ro...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Mercer Island

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Forest Products and Packaging, Water Supply and Storage, Waste Processing and Treatment, Government, Commercial

Article published date

2024-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project