PRVs Phase I Structure Repairs
Sector: Power Generation (CCGT) • Location: Columbia, South Carolina, United States of America
Source: Dodge
Structure Repairs at Various Pressure Release Valves Phase I (WM4282) MPP Prot g Only BID036-24-25-LB COPE OF WORK A. Furnish all labor, materials, equipment and incidentals required to repair the four PRV stations according to the provided repair drawings and as specified herein. B. The Work varies across the sites (not all sites include all work listed below). Work includes, but is not necessari
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Cement, Government
- Location
- Columbia, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about PRVs Phase I Structure Repairs
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Structure Repairs at Various Pressure Release Valves Phase I (WM4282) MPP Prot g Only BID036-24-25-LB COPE OF WORK A. Furnish all labor, materials, equipment and incidentals required to repair the four PRV stations according to the provided repair drawings and as specified herein. B. The Work varies across the sites (not all sites include all work listed below). Work includes, but is not necessarily limited to, the following: 1. Repair masonry wall crack(s) with specified material. 2. Repair ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Columbia |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Cement, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
