Prysmian receives extension of Suedostlink project
Sector: Broadband • Location: France
Source: Energy Projects & Technology
Prysmian Group further strengthens its prominent role in the development of power transmission infrastructure in Europe. German grid operator TenneT TSO GmbH confirmed its trust in Prysmian by giving the second 2 GW system as an extension of SuedOstLink worth approximately €700 MLN contract for the development of 546 km of 525kV HVDC underground cable systems. This reaffirms Prysmian`s role in the
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Prysmian Group further strengthens its prominent role in the development of power transmission infrastructure in Europe. German grid operator TenneT TSO GmbH confirmed its trust in Prysmian by giving the second 2 GW system as an extension of SuedOstLink worth approximately €700 MLN contract for the development of 546 km of 525kV HVDC underground cable systems. This reaffirms Prysmian`s role in the German HVDC Projects, SuedOstLink, SuedLink and A-Nord, which were already secured by Prysmian for an amount of over €1.5 BLN and that are currently under execution. Prysmian will supply and install a land system to transport renewable energy from wind farms in northern and eastern Germany to high-consumption cities and factory areas in Germany’s south which is essential for Germany’s energy transition. SuedOstLink consists of two projects – V5 and V5a. Both projects, each with 2GW, will together supply the south of Germany/Bavaria with 4 GW power. “Following the award of the major portion of the German projects already secured, this extension represents a further development of our longstanding trust and relationship with TenneT, and will set a new benchmark for both the product itself and for EPC know-how in underground cabling,” said Hakan Ozmen, EVP Projects BU, Prysmian Group. The first 20 km of the around 550 km of cables for the approx. 270 km route of SuedOstLink (V5) were completed and delivered at the beginning of 2022. The HVDC P-Laser cable used for the project has been developed by Prysmian Group and will be produced in Gron, France, where investment in a new second production line is underway. Network components will be produced in Livorno, Italy, while the fibre optical cable will be made in Slatina, Romania. The P-Laser cable solution offers a power transmission capacity of over 2 GW on a single system and is the first 100% recyclable, environmentally friendly, high-performance insulation technology based on HPTE (High-Performance Thermoplastic Elastomer), which cuts CO2 emissions in production by 30%. Delivery of the cables for V5a is scheduled from 2025 onwards Project V5a will go into operation in 2030. This V5a extension runs parallel to the SuedOstLink corridor V5. Source: https://www.prysmiangroup.com/Image source: Courtesy of Prysmian Group Read more Power news here Read more Power cable news here |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Low |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
