PS 15 Kentfield Capacity Improvements
Sector: Water Supply and Storage • Location: Kentfield, California, United States of America
Source: Dodge USA
To address capacity deficiencies identified in the 2023 flow modeling study, increase firm capacity of PS15 from 37.9 MGD to 45.0 MGD, replacing three (3) large pumps (400 hp) and two standard dry weather pumps that were originally installed in 1997 and are showing signs of age.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Kentfield, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about PS 15 Kentfield Capacity Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | To address capacity deficiencies identified in the 2023 flow modeling study, increase firm capacity of PS15 from 37.9 MGD to 45.0 MGD, replacing three (3) large pumps (400 hp) and two standard dry weather pumps that were originally installed in 1997 and are showing signs of age. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Kentfield |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
