Psaltry International Solar Power Project
Sector: Power Generation (CCGT) • Location: Ado-Awaye, Oyo, Nigeria
Source: New Telegraph
Psaltry International Company Limited has commissioned a 1.1-kilowatt solar power system and a 1.1-megawatt battery installation at its plant in Ado-Awaye, Oyo State. This project aims to enhance energy reliability and reduce costs while benefiting the local community.
- Status
- Closed
- Sector
- Power Generation (CCGT), Energy Storage, Solar, Government
- Location
- Ado-Awaye, Oyo, Nigeria
- Updated
- 22 Jul 2026
- Source
- New Telegraph
ConstructChat
Ask ConstructChat about Psaltry International Solar Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Psaltry International Company Limited has commissioned a 1.1-kilowatt solar power system and a 1.1-megawatt battery installation at its plant in Ado-Awaye, Oyo State. This project aims to enhance energy reliability and reduce costs while benefiting the local community. |
Original sector | Energy |
Location
Country | Nigeria |
State | Oyo |
City | Ado-Awaye |
Source
Source | New Telegraph |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Energy Storage, Solar, Government |
Article published date | 2025-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
