logo

PSCo Wildfire Mitigation Plan

Sector: Power Generation (CCGT) • Location: Colorado, United States

Source: Stock Titan

Project
Approved

PSCo filed an Updated Wildfire Mitigation Plan covering 2025 to 2027 with an estimated total cost of approximately $1.9 billion. The plan includes mitigation activities and a Public Safety Power Shutoffs plan to reduce wildfire risk comprehensively and efficiently.

Status
Prospective
Sector
Power Generation (CCGT)
Location
Colorado, United States of America
Updated
22 Jul 2026
Source
Stock Titan

ConstructChat

Ask ConstructChat about PSCo Wildfire Mitigation Plan

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “PSCo Wildfire Mitigation Plan” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Colorado, United States. Taiyo aggregates data on it from Stock Titan.

Participants

Not available for this record.

Status

Original status

approved

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

PSCo filed an Updated Wildfire Mitigation Plan covering 2025 to 2027 with an estimated total cost of approximately $1.9 billion. The plan includes mitigation activities and a Public Safety Power Shutoffs plan to reduce wildfire risk comprehensively and efficiently.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Colorado

Source

Source

Stock Titan

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project