PSFB Streets Repairs & Parking Upgrades
Sector: Water Supply and Storage • Location: Patrick Space Force Base, Florida, United States of America
Source: Dodge
Repair Challenger Street from the west edge at Spacelift Ave to the east edge at Falcon Ave. Work to be performed will include the demolition and removal of existing paved surface, base course, curbing, and drainage structures within the designated repair area. Proper disposal of all demolition debris is required. Install new road base, graded to ensure positive drainage. Repave Challenger Street
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Hydro, Road, Waste Processing and Treatment, Commercial, Car parking, Automotive
- Location
- Patrick Space Force Base, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about PSFB Streets Repairs & Parking Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Repair Challenger Street from the west edge at Spacelift Ave to the east edge at Falcon Ave. Work to be performed will include the demolition and removal of existing paved surface, base course, curbing, and drainage structures within the designated repair area. Proper disposal of all demolition debris is required. Install new road base, graded to ensure positive drainage. Repave Challenger Street from Falcon Ave to Spacelift Ave and install concrete curbing and drainage structure. Replace dam... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Patrick Space Force Base |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Hydro, Road, Waste Processing and Treatment, Commercial, Car parking, Automotive |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
