PsiQuantum TI - Phase 2
Sector: Manufacturing (Industrial) • Location: Milpitas, California, United States of America
Source: Dodge
PSIQUANTUM CORPORATION PHASE 2: Tenant improvement (18832sf) for new cryostat room, ADA restroom improvements, and new Mother's Room. Includes demolition of walls, ceiling, and lighting. Lighting to be in new Cryostat Room. Existing restroom finishes, ceilings, and lighting to remain. Exterior improvement includes installation of new cryostat support equipment at the existing exterior equipment pl
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Commercial
- Location
- Milpitas, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about PsiQuantum TI - Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | PSIQUANTUM CORPORATION PHASE 2: Tenant improvement (18832sf) for new cryostat room, ADA restroom improvements, and new Mother's Room. Includes demolition of walls, ceiling, and lighting. Lighting to be in new Cryostat Room. Existing restroom finishes, ceilings, and lighting to remain. Exterior improvement includes installation of new cryostat support equipment at the existing exterior equipment platform and new LN2 tank equipment pad with connecting trench to the building. |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Milpitas |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
