logo

PT Ades Alfindo Putrasetia

Sector: Warehouse • Location: Indonesia

Source: International Finance Corporation (IFC)

Project
Completed

Summary Of Project Information (SPI)Project NameIndonesia-Ades Water and Beverage Manufacturing     RegionAsiaSectorProject No008275Projected Board DateJune 19, 1997Company NameP.T. AdeS Alfindo PutrasetiaTechnical Partner and/or Major Shareholders Ades was established in 1985 by Mr. A. Gunawan, who currently controls 61% of Ades’s shares, while the remaining 39% is held by the public. Since 1993,

Project Information FAQ

Project Information

4 Q
The project “PT Ades Alfindo Putrasetia” is an infrastructure initiative in the Warehouse sector, located in Indonesia. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Summary Of Project Information (SPI)Project NameIndonesia-Ades Water and Beverage Manufacturing     RegionAsiaSectorProject No008275Projected Board DateJune 19, 1997Company NameP.T. AdeS Alfindo PutrasetiaTechnical Partner and/or Major Shareholders Ades was established in 1985 by Mr. A. Gunawan, who currently controls 61% of Ades’s shares, while the remaining 39% is held by the public. Since 1993, Ades has also been the exclusive distributor for the French “Evian” bottled water in Indonesia. In 1994, Ades also entered the juice-based beverage market by establishing a joint venture agreement with Quaker Oats (US), for producing and distributing the “Gatorade” beverage products in Indonesia.Project Cost Including proposed IFC investment Total project cost is estimated at US$99.8 million; IFC’ proposed investment in Ades consists of an A loan of US$25.0 million, a B loan of US$50.0 million, and an equity or quasi-equity investment of up to an additional US$6.0 million for IFC’s account.   Location of project and Description of site The Project will be located at Ades’existing 9 facilities and at a new location in Ujung Pandang (in Sulawesi island, East Indonesia).Description of Company and Purpose of Project Ades is currently one of Indonesia’s leading domestic producers and distributors of bottled water and soft drinks. The Project is to expand Ades’s existing water and beverage producing facilities in Indonesia. Specifically, the project aims to: (i) increase bottled water making capacity by establishing a new facility in Ujung Pandang (in Sulawesi island, East Indonesia) and by expanding and modernizing the existing facility in Sukabumi (West Java); (ii) establish distilled water production capability in Cibinong (West Java); (iii) establish new production capability for juice and tea based products in West Java and Surabaya; (iv) provide PET packaging capabilities in Medan, Cibinong, Semarang, Surabaya, Denpasar and Ujung Padang; and (v) expand Ades’s distribution network by establishing new warehousing and distribution centers.Environmental Category and Issues This is a category B project according to IFC’s environmental review procedure. Environmental, health and safety issues associated with this project include: air emissions, liquid effluents, solid waste, site selection criteria and integrity of the water supply, fire prevention and emergency response, employee exposure to noise, and environmental, health and safety performance of existing operations. Air emissions are negligible from these plants, and liquid process waste is largely wash water which is readily treated on site; there is no discharge from the plant site in most cases. Water supply is from deep wells or springs which are monitored to ensure consistency in water quality. Fire protection systems are being upgraded as part of this project, to meet international standards and World Bank guidelines. The project is being designed to fully comply with all relevant Indonesian laws and regulations and with World Bank policies and guidelines.     The is available from the Public Information Center.Date SPI sent to PIC May 16, 1997For Additional Information contact: Corporate Relations Unit -telephone: (202) 473-7711facsimile: (202) 676-0365Environmental documents for this project are available at http://www.ifc.org and from the World Bank InfoShop (http://www.worldbank.org/html/pic/aboutinfo.html).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data