PT Asrigita Prasarana

Sector: Natural Gas • Location: Indonesia

Source: World Bank Group

Project
Active

The 130-MW Palembang Gas-Fired Power Plant was being developed by PT Asrigita Prasarana, a consortium of PT Astra International (87%) and local businessman Martini Salaeman (13%). The project was to use both natural gas and combined-cycle technologies. The project was being developed as a 20-year BOT. GE Power Systems was the primary project contractor. A 20-year PPA with the national utility Peru

Project Information FAQ

Project Information

5 Q
The project “PT Asrigita Prasarana” is an infrastructure initiative in the Natural Gas sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The 130-MW Palembang Gas-Fired Power Plant was being developed by PT Asrigita Prasarana, a consortium of PT Astra International (87%) and local businessman Martini Salaeman (13%). The project was to use both natural gas and combined-cycle technologies. The project was being developed as a 20-year BOT. GE Power Systems was the primary project contractor. A 20-year PPA with the national utility Perushaan Listrik Negara (PLN) to sell 80% of power from the Palembang plant was signed on November 12, 1996. Natural gas was being supplied from the Asamera field in southern Sumatra. The US $168.5-million project began construction in 1997 but stalled in 1997 as a result of the Asian economic crisis. In May 2003, a consortium headed by the China National Chemical Engineering Corp. acquired the equity in the company set up to develop a 150-MW power project. The consortium also included the China Civil Engineering Construction Corp. and PT Sumbergas Sakti Prima. The consortium acquired ownership of PT Asrigita Prasarana, which had the rights to develop the gas-fired combined-cycle plant at East Palembang on a build-own-operate basis for 20 years. Construction started in September 2003, according to the state-owned electricity utility Perusahaan Listrik Negara, which was to become the off-taker. The project had a debt/equity ratio of 75:25. Financing was being arranged by Chase Manhattan Bank. The plant came into operation in August 2004.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data