IFC is considering an A-loan to support BDSN’s operational 180 MW Asahan-1 hydropower plant (HPP) in North Sumatra, Indonesia (the project). The plant has been fully operational since January 2011 and sells electricity to PLN pursuant to a long-term PPA expiring on Dec 31, 2040 on a take-or-pay basis of 1,175 GWh of electricity per year. Asahan-1 is developed by the Independent Power Producer (IPP
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | IFC is considering an A-loan to support BDSN’s operational 180 MW Asahan-1 hydropower plant (HPP) in North Sumatra, Indonesia (the project). The plant has been fully operational since January 2011 and sells electricity to PLN pursuant to a long-term PPA expiring on Dec 31, 2040 on a take-or-pay basis of 1,175 GWh of electricity per year. Asahan-1 is developed by the Independent Power Producer (IPP) BDSN (the company), which is owned by Fareast Green Energy and PJB (the latter a subsidiary of PLN, the national power company), respectively. The HPP located 25 km downstream of Lake Toba on the Asahan River in North Sumatra, Indonesia, is approximately 130 km southeast of the city of Medan. Land acquisition and construction of the plant was initiated in 1997, but was stalled a year later following Indonesia’s financial crisis. Construction restarted in 2006/7 and the HPP was finally commissioned in 2010. The operation and maintenance (O&M) since January 2014 has been contracted to PJB Services (PJBS), a subsidiary of PJB Asahan-1 is a run-of-river scheme developed to utilize the hydraulic head between the Regulating Dam and Siguragura Dam of the pre-existing Asahan-2 project, a three dam cascade developed between 1975-1982 to support the PT Inalum smelter, located on the North Sumatra coastline near Medan. The Asahan-2 scheme, which is not part of this project, comprises a 39 m Regulating Dam, a 47 m, 286 MW Siguragura Dam and HPP, and a 73 m, 317 MW Tangga Dam and HPP. The scheme relies on releases from Lake Toba, the largest volcanic lake in the world, as the Asahan River is the primary drainage of this lake to the Straits of Malacca. The Asahan Authority, comprised of a number of state entities, was established to ensure smooth operation of the Asahan-2 project, including the Inalum smelter. The Asahan-1 HPP comprises of a 6.5 km tunnel, 70 m surge shaft, 275 m penstock, powerhouse with two 90 MW Francis turbines, accommodation camp and switchyard (the latter handed over to PLN). The intake is located in the pre-existing Regulating Dam which drains water directly from Lake Toba, and the powerhouse is located at the top end of the pre-existing Siguragura Dam, into which the tailrace empties. The project is linked to the grid by an 8 km transmission line, though BDSN only owns and maintains the three transmission towers that link the transformer at the powerhouse with the switchyard. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |