logo

PT Jawa Power

Sector: Power Transmission • Location: Indonesia

Source: World Bank Group

Project
Active

In 1995 PT Jawa Power began the development of the 1,220 MW (2x615-MW) Painton II power plant in Paiton, East Java. Jawa Power was distinct from the more well known Paiton I developed by the Paiton Energy Company and was also located in Paiton, East Java. The Jawa plant was being developed through a 30-year BOT-scheme that was to take effect after construction had been completed. The plant was t

Project Information FAQ

Project Information

4 Q
The project “PT Jawa Power” is an infrastructure initiative in the Power Transmission sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In 1995 PT Jawa Power began the development of the 1,220 MW (2x615-MW) Painton II power plant in Paiton, East Java. Jawa Power was distinct from the more well known Paiton I developed by the Paiton Energy Company and was also located in Paiton, East Java. The Jawa plant was being developed through a 30-year BOT-scheme that was to take effect after construction had been completed. The plant was to sell power to Perushaan Listrik Negara (PLN, the state-owned electricity utility) under a power purchase agreement signed in 1995. The plant would be fueled by coal purchased through a supply agreement with PT Kideco Jaya and PT Berau Coal. The plant would be operated by Powergen subsidiary JPT Powergen Jawa Timur. Jawa Power was a joint venture between Siemens Power Ventures (50%), a subsidiary of Siemens AG (Germany), PowerGen Plc (UK, 35%) and PT Bumipertiwi Tatapradipta (15%), which was controlled by the PT Bimantara Citra Group (Indonesia). In 2004, PT Bumipertiwi Tatapradipta, exercised its preferential purchase rights to purchase PowerGen’s 35% stake, which it immediately sold on to Malaysian power company YTL Power for US$139 million. YTL also gained operating rights of the plant as part of the deal. The Jawa Power plant was being financed from a mixture of syndicated loans, export credits and sponsor equity. The project had a debt/equity ratio of roughly 80:20. Siemens, Black & Veatch, and ABB Combustion Engineering were project contractors and Siemens was the main equipment supplier. ABB Combustion Engineering was to deliver boilers for the project. The project was expected to become operational during 1999. The government put on hold many of the independent power producer projects in late 1997 as part of the retrenchment program to cope with the economic crisis. PLN, which was financially troubled by the crisis, asked to renegotiate the PPAs, especially with regards the price. In 2003, 14 of the 26 IPPs, including PT Jawa, agreed to continue their projects under a new pricing scheme, while seven agreed to terminate the PPAs. The government and PLN each agreed to take over two projects. None None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data