logo
ProjectActive

PT Medco Sarulla Geothermal Plant

Active · Riau

Source: World Bank Group

PT Medco Energi International Tbk led a consortium (27.5%)comprising of Japan's Kyushu electric Power Corp (25%), Itochu corp (25%) and the US company ORMAT Industries (12.75%), in the development of a 340 MW geothermal project to be located in Northern sumatra, Indonesia. The project was to be constructed in two 110 MW and one 120 MW phases. ORMAT would supply the turbines for the project.

PT

Status
Prospective
Sector
Commercial, Geothermal, Wind, Manufacturing (Industrial), Power Transmission, Power Generation (CCGT), Government
Location
Riau, Indonesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about PT Medco Sarulla Geothermal Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “PT Medco Sarulla Geothermal Plant” is an infrastructure initiative in the Commercial sector, located in Riau, Indonesia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

PT Medco Energi International Tbk led a consortium (27.5%)comprising of Japan's Kyushu electric Power Corp (25%), Itochu corp (25%) and the US company ORMAT Industries (12.75%), in the development of a 340 MW geothermal project to be located in Northern sumatra, Indonesia. The project was to be constructed in two 110 MW and one 120 MW phases. ORMAT would supply the turbines for the project. PT Medco Power Indonesia received an equity investment of $25 million for the expansion of operations. The decision was approved in February 2012, and invested in March 2012. The project was contracted to sell power to state utility PLN under a 30 year PPA with a price of power of USD 0.0697/kWh. total project cost was estimated at USD 1.6 billion. In August 2011, the project reached financial close when six banks, Bank of Tokyo-Mitsubishi UFJ Ltd., ING Groep NV (INGA), Mizuho Corporate Bank Ltd., National Australia Bank Ltd. (NAB), Societe Generale (GLE) SA and Sumitomo Mitsui Banking Corp were selected to syndicate a USD 410 million loan for the project. It was reported that pricing for the loan was to be 200 basis points above the London Bank Inter-Offer Rate. Further financing was to come from the the Japan Bank for International Cooperation for USD 600 million and the Asian Development Bank for USD 250 million - approved October 2011. The remainder USD 310 million was expected as an equity contribution form the sponsors. Expected final commissioning for the three phases was for 2016. However, the commercial loan's financial closure was not yet reached due to disagreements between PLN and PT Medco over the underlying securities of the debt, concluded in May 2012. Financial closure was now expected for late-2012. The six banks were selected from 10-11 submissions to an RFP for the project. JBIC also provided an EPRG on the commercial loan. In March 2012, the IFC acquired 11% equity share in the developer PT medco Power, at a value of US$112 million. This was done via a consortium led by Saratoga Capital. http://thinkgeoenergy.com/archives/8317 http://www.power-technology.com/projects/sarullgeothermalpowe/ See: http://thinkgeoenergy.com/archives/9878 for PPP info http://www.ifc.org/ifcext/spiwebsite1.nsf/ProjectDisplay/SPI_DP31462 http://www.bloomberg.com/news/2011-08-10/sarulla-consortium-hires-banks-for-410-million-geothermal-loan.html AUGUST 2012: MOST PROBABLY DID NOT REACH FINANCIAL CLOSURE YET: APPOINTED BANKS IN AUGUST 2011, NOT CLOSURE. THIS IS EXPECTED IN LATE-2012.

Original sector

Energy

Procurement method

Budget

Location

Country

Indonesia

State

Riau

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Geothermal, Wind, Manufacturing (Industrial), Power Transmission, Power Generation (CCGT), Government

Article published date

2024-05-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project