PT Supreme Rajabasa Geothermal Plant
Sector: Water Supply and Storage • Location: Indonesia
Source: World Bank Group
PT Supreme Energy and International Power-GDF SUEZ were planning the development of the 220MW Rajabasa geothermal plant, South Lampung Regency, 60km South East of Bandar Lampung, Lampung Province. The project was to consist of 2 units of 110MW.
The developers received the concession following a tender in 2010. On March 2nd, 2012, a PPA was signed between Perusahan Listrik Negara (PLN) and the de
- Status
- Prospective
- Sector
- Water Supply and Storage, Geothermal, Power Generation (CCGT), Government, Commercial
- Location
- Indonesia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about PT Supreme Rajabasa Geothermal Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | PT Supreme Energy and International Power-GDF SUEZ were planning the development of the 220MW Rajabasa geothermal plant, South Lampung Regency, 60km South East of Bandar Lampung, Lampung Province. The project was to consist of 2 units of 110MW. The developers received the concession following a tender in 2010. On March 2nd, 2012, a PPA was signed between Perusahan Listrik Negara (PLN) and the developers, which included a Guarantee Letter. Civil construction and exploration drilling started in March 2012. In September 2012, the first Exploration well drilling ML-A1 was conducted, a series of 4-6 drilling exploration wells. Exploration drilling is expected to last 6-9 months. The Environmental permit, location permit, water use permit and business license, as well electricity supply license were acquired. Commissioning was expected in 2016. http://www.supreme-energy.com/page.php?menu=15&content=21 |
Original sector | Energy |
Procurement method |
Location
Country | Indonesia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Geothermal, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-09-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
