logo
ProjectActive

PT Tanjung Kasam Coal Plant

One of 30 projects Taiyo tracks in Riau Islands.

Source: World Bank Group

PT Tanjung Kasam Power was developing the 110 MW coal plant in Kepulauan Riau province, Batam. The project was to consist of 2 turbines of 55MW. The project was owned by a consortium of China Huadian Engineering Corporation (CHEC), the local power utility PT PLN Batam, and PT Petra Unggul Sejahtera. PT PLN Batam was wholly-owned by state-owned utility PT Perusahaan Listrik Negara (PLN), but was ex

Status
Prospective
Sector
Commercial, Wind, Power Generation (CCGT), Power Transmission, Government
Location
Riau Islands, Indonesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about PT Tanjung Kasam Coal Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “PT Tanjung Kasam Coal Plant” is an infrastructure initiative in the Commercial sector, located in Riau Islands, Indonesia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

PT Tanjung Kasam Power was developing the 110 MW coal plant in Kepulauan Riau province, Batam. The project was to consist of 2 turbines of 55MW. The project was owned by a consortium of China Huadian Engineering Corporation (CHEC), the local power utility PT PLN Batam, and PT Petra Unggul Sejahtera. PT PLN Batam was wholly-owned by state-owned utility PT Perusahaan Listrik Negara (PLN), but was expected to be publicly offered by late-2012. The project became operational in June 2012, and will start commercial operations in September 2012. CHEC;s involvement in the project was approved by China's National Development and Reform Commission in 2010. Construction started in March 2011. The EPC contract was awarded to CHEC, and was valued at US$ 168.75 million. The first supply of coal was to arrive in April 2012, sourced from East Kalimantan, Indonesia. The output was to be sold on IPP basis for 30 years to PLN Batam. The operator was to be CHD Power Plant Operation Co. Ltd., an affiliate of CHEC. The developer was expecting an electricity tariff of US$0.0395 per kWh. Total cost of the project was US$126 million, but has also been estimated at US$200 million. The conservative estimate of US$126 million was reported here. Financing was to be provided by the Export Import Bank of China. http://en.indonesiafinancetoday.com/read/20787/TJK-Power-Secures-US-771.9-M-from-Electricity-Sales-to-PLN-Batam

Original sector

Energy

Budget

Location

Country

Indonesia

State

Riau Islands

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Wind, Power Generation (CCGT), Power Transmission, Government

Article published date

2024-05-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project