PTSC0002200131 T-CUBED CABLE RELOC ROCK SPRING GA LYERLY-CHA
Sector: Broadband • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
Relocation of T-Cubed (Norfolk Southern) Fiber Optic Cable in Rock Spring GA for $150,000.00, within GDOT Railroad Property Lyerly, GA to Chattanooga, TN, from the west side to the east side of the Mainline, to give room for the New Storage siding of the Project ID #T002518 Project #PTSC0 0022 00 123 Rail Line Rehabilitation Lyerly-Chattanooga and New Siding in Rock Spring, GA for $2,900,000.00.
- Status
- Failure
- Sector
- Broadband, Manufacturing (Industrial), Power Transmission, Rail, Telecommunications, Cable car, Government, Automotive, Power Generation (CCGT)
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about PTSC0002200131 T-CUBED CABLE RELOC ROCK SPRING GA LYERLY-CHA
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | deferred |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Relocation of T-Cubed (Norfolk Southern) Fiber Optic Cable in Rock Spring GA for $150,000.00, within GDOT Railroad Property Lyerly, GA to Chattanooga, TN, from the west side to the east side of the Mainline, to give room for the New Storage siding of the Project ID #T002518 Project #PTSC0 0022 00 123 Rail Line Rehabilitation Lyerly-Chattanooga and New Siding in Rock Spring, GA for $2,900,000.00. Both Projects are directly related to the $3,050,000.00 FY 2007 Rail Bond Legislature Approved and Signed the Governor into Rail Programs Budget. New Siding in Rock Spring, GA to Serve Shaw Industries TRANSLOAD FACILITY, both have been DELAYED and placed on HOLD. Consequently the T-Cubed Utility Relocation is NO LONGER REQUIRED. Project ID #T003454 is therfore CANCELLED. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Broadband, Manufacturing (Industrial), Power Transmission, Rail, Telecommunications, Cable car, Government, Automotive, Power Generation (CCGT) |
Article published date | 2024-03-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
