PTTEP Arthit CCS Facilities Project
The owner, status and timeline of this project. A free account opens every field.
Source: Splash247
The project involves detailed engineering for new carbon capture and storage (CCS) processing units and CO2 injection facilities, including brownfield modifications to the existing Arthit central processing platform. It leverages existing infrastructure at the Arthit field and aims to gradually ramp up capacity to around 1 million tonnes of carbon dioxide per year. The project serves as a pilot to
- Status
- Closed
- Sector
- Energy
- Location
- Thailand
- Updated
- 22 Jul 2026
- Source
- Splash247
ConstructChat
Ask ConstructChat about PTTEP Arthit CCS Facilities Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves detailed engineering for new carbon capture and storage (CCS) processing units and CO2 injection facilities, including brownfield modifications to the existing Arthit central processing platform. It leverages existing infrastructure at the Arthit field and aims to gradually ramp up capacity to around 1 million tonnes of carbon dioxide per year. The project serves as a pilot to cultivate expertise and drive CCS adoption in Thailand, representing a strategic step toward reducing greenhouse gas emissions. |
Original sector | Energy |
Location
Country | Thailand |
Source
Source | Splash247 |
URL |
More Details
Record type | Project |
Article published date | 2025-12-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
