Public Restroom Construction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Construction of a new restroom facility at Greenway Park, located on Culberson Ave, LaFayette, GA 30728. The restroom will be situated near the skatepark. Building dimensions: 16 x 20 feet Exterior siding: Hardie board lap siding, painted Iron Mountain Gray Roof: 30 year black architectural shingle with HIP roof Wall height: 9 feet Windows: Four 12 x 20-inch windows on the north and south sides (8
- Status
- Closed
- Sector
- Car parking, Commercial, Manufacturing (Industrial), Government, Metal, Steel, Automotive
- Location
- Lafayette, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Public Restroom Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a new restroom facility at Greenway Park, located on Culberson Ave, LaFayette, GA 30728. The restroom will be situated near the skatepark. Building dimensions: 16 x 20 feet Exterior siding: Hardie board lap siding, painted Iron Mountain Gray Roof: 30 year black architectural shingle with HIP roof Wall height: 9 feet Windows: Four 12 x 20-inch windows on the north and south sides (8 total) Stonework: 42 inches of Majestic natural stone around the exterior on all sides with colu... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Lafayette |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Manufacturing (Industrial), Government, Metal, Steel, Automotive |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
