PUC Power Line Project
Under construction · Ontario · Last reported Jun 2026
Source: Sault Star
Construction of a new 230 kV transmission line and transmission station to provide Algoma Steel with the power needed to operate two electric arc furnaces. The line will stretch about 10 kilometres from Hydro One's Third Line Transformer Station to a new station on Yates Avenue, increasing local power grid reliability and supporting future development.
- Status
- Under Construction
- Sector
- Hydro, Power Generation (CCGT), Steel
- Location
- Sault Ste. Marie, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Sault Star
ConstructChat
Ask ConstructChat about PUC Power Line Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a new 230 kV transmission line and transmission station to provide Algoma Steel with the power needed to operate two electric arc furnaces. The line will stretch about 10 kilometres from Hydro One's Third Line Transformer Station to a new station on Yates Avenue, increasing local power grid reliability and supporting future development. |
Original sector | Energy |
Budget |
Location
Country | Canada |
State | Ontario |
City | Sault Ste. Marie |
Source
Source | Sault Star |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Steel |
Article published date | 2026-05-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
