logo

Puente Internacional Reynosa - Anzalduas

Sector: Road • Location: Mexico

Source: World Bank Group

Project
Active

On June 28, 2007, the federal secretary of communications and transportation (SCT) awarded a consortium led by Grupho Marhnos a 30 year greenfield contract to construct, operate, exploit, conserve and maintain a new 10km international toll bridge in the state of Tamaulipas. The Puente Internacional Reynosa – Anzalduas was to connect the Mexican city of Reynosa with Mission, Texas. The US side of t

Project Information FAQ

Project Information

5 Q
The project “Puente Internacional Reynosa - Anzalduas” is an infrastructure initiative in the Road sector, located in Mexico. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

On June 28, 2007, the federal secretary of communications and transportation (SCT) awarded a consortium led by Grupho Marhnos a 30 year greenfield contract to construct, operate, exploit, conserve and maintain a new 10km international toll bridge in the state of Tamaulipas. The Puente Internacional Reynosa – Anzalduas was to connect the Mexican city of Reynosa with Mission, Texas. The US side of the bridge was to be built by a separate contractor. The Puente Internacional Reynosa – Anzalduas was part of the Programa Sectorial de Comunicaciones y Transportes which sought to construct or modernize over 17,000km of roads between 2007 and 20012. The contract was granted under the new highway concession model which transferred all of the traffic risk to the private operator and required a minimum equity contribution. The new model also provided a minimum revenue guarantee for each project. The contract was awarded through an international competitive tender that began on June 1, 2006 by SCT. To participate in the public tender, each bidder had to calculate and submit a requested payment as a function of construction, maintenance and operating costs, rate of return on equity, estimated annual traffic and duration of contract. The concession was awarded to the bidder who presented a proposal that complied with the technical, legal and financial requirements established in the bidding documents, and requested the lowest sum of the net present value of the minimum revenue guarantee and the initial public contribution. There were six bidders for the contract: • Compania Contratista Nacional SA de CV • Constructora Garza Ponce SA de CV, and Grupo Rio San Juan SA de CV • GAMI Ingeniera e Instalaciones SA de CV • Construobras de la Garza SA de CV, and Construcciones y Puentes de Chihuahua SA de CV • Concesionaria de Proyectos de Infraestructura SA de CV; Grupo Constructor Marhnos SA de CV; and Marhnos Turismo SA de CV • Omega Construcciones Industriales SA de CV On July 27, 2007, the consortium of Concesionaria de Proyectos de Infraestructura SA de CV; Grupo Constructor Marhnos SA de CV; and Marhnos Turismo SA de CV signed the contract. Construction began on the bridge in August of 2007 and was scheduled to finish in June 2009. Total Investments in the new bridge were estimated at US $60.1 million. The private operator was allowed to charge tolls until an amount specified in the contract which was not publicly available. After this amount was reached, toll revenue was to be split between the government and the private operator.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data