logo

Puerto Bahia

Sector: Commercial • Location: Colombia

Source: World Bank Group

Project
Active

In June 2012, Pacific Infrastructure, a subsidiary of the Canadian oil company Pacific Rubiales, was granted through direct negotiations with federal authorities the right to build, own and operate the multipurpose terminal facilities named Puerto Bahia located at the Cartagena Bay (Colombia). The pier will have two berths, one for 80,000 ton ships and another for ships of up to 150,000 tons. The

Status
Prospective
Sector
Commercial, Oil and Gas, Raw Materials, Seaport, Government, Manufacturing (Industrial), Water Supply and Storage
Location
Colombia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Puerto Bahia

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Puerto Bahia” is an infrastructure initiative in the Commercial sector, located in Colombia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In June 2012, Pacific Infrastructure, a subsidiary of the Canadian oil company Pacific Rubiales, was granted through direct negotiations with federal authorities the right to build, own and operate the multipurpose terminal facilities named Puerto Bahia located at the Cartagena Bay (Colombia). The pier will have two berths, one for 80,000 ton ships and another for ships of up to 150,000 tons. The crude oil and products terminal was set to have a storage capacity of 3.0 million barrels of crude oil and derivatives and projected port throughput of 54.0 million barrels per year. The Puerto Bahia terminal project also included facilities for the handling of dry bulk and general cargo, in addition to a fully interconnected tank farm with direct access to local refineries and a crude oil pipeline. The investment was estimated at US$ 620 million over the life of the project. Financial closure was achieved in October 2013, when Milbank, Tweed, Hadley & McCloy LLP represented Itau BBA S.A. in providing a US$ 370 million loan to the sponsor. The remaining investment cost was set to be equity financed. An EPC contract for the construction of the facilities was signed with Isolux Corsan (Spain), Tradeco (Mexico) and Tampa Tanks (USA) in September 2012. As of March 2013, construction works were underway. Operations were set to commence in 2015.

Original sector

Transport

Budget

Location

Country

Colombia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Oil and Gas, Raw Materials, Seaport, Government, Manufacturing (Industrial), Water Supply and Storage

Article published date

2024-05-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project