Puerto Bolivar port PPP project
Closed · Ecuador
Source: InfraPPPWorld
The project involves the design, build, finance operation and maintenance (DBFOM) of the new terminal during the 50-year concession period. The scope of the 5-phase project will entail the development and modernization of the port.The dredging work will deepen the draft from 10 meters to firstly 14 meters, and then to 17 meters. A new, 450-meter long quay will be built. The terminal will be equipp
- Status
- Closed
- Sector
- Government
- Location
- Ecuador
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Puerto Bolivar port PPP project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the design, build, finance operation and maintenance (DBFOM) of the new terminal during the 50-year concession period. The scope of the 5-phase project will entail the development and modernization of the port.The dredging work will deepen the draft from 10 meters to firstly 14 meters, and then to 17 meters. A new, 450-meter long quay will be built. The terminal will be equipped with modern infrastructure and cranes. Consequently, the largest container ships of the world will berth and receive services at Puerto Bolívar. Upon completion of 5 investment phases, the annual container handling capacity will reach 2.5 million TEU. Eventually, the port will become the largest and the most advanced state-of-the-art container terminal on the Pacific coast of Latin America. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Ecuador |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Government |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
