logo

Puerto Plata Diesel-Power Plant

Sector: Commercial • Location: Dominican Republic

Source: World Bank Group

Project
Cancelled

The project consists of two diesel power plants with a total installed capacity of 69-MW. One unit, 19-MW, is located inland and has a 20-year power purchase agreement with Corporacion Dominicana de Electricidad (CDE). The other unit is a 50-MW barge-mounted plant with a 10-year power purchase agreement. The total cost of the project was $75 million. The power plants started commercial operations

Status
Failure
Sector
Commercial, Power Generation (CCGT), Government, Manufacturing (Industrial)
Location
Dominican Republic
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Puerto Plata Diesel-Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Puerto Plata Diesel-Power Plant” is an infrastructure initiative in the Commercial sector, located in Dominican Republic. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Cancelled

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of two diesel power plants with a total installed capacity of 69-MW. One unit, 19-MW, is located inland and has a 20-year power purchase agreement with Corporacion Dominicana de Electricidad (CDE). The other unit is a 50-MW barge-mounted plant with a 10-year power purchase agreement. The total cost of the project was $75 million. The power plants started commercial operations in 1994. The initial developer, Warsila Power Development, sold the project to a consortium of Coastal Power Production (48.5%), Commonwealth Development Corp. (48.5%), and Basic Energy Ltd. (3%). The project was financed under a foreign export program design to encourage the U.S. shipbuilding industry. In 2001, El Paso Corporation acquired Coastal Power along with Coastal's 48.5% stake in Puerto Plata Diesel-Power Plant. In July of 2002, the commission in charge of renegotiating government contracts with private generators reached an agreement that revoked El Paso's contract with Corporacion Electrica Puerto Plata. The Government paid US$35 million to rescind the contract, claiming the action would save the state US$24 million a year. April 2006 CDC Globeleq acquired 97% of the 67 MW project Compania de Electricidad de Puerto Plata (CEPP). http://www.globeleq.com/fw/main/default.asp?DocID=1502 None

Original sector

Energy

Budget

Location

Country

Dominican Republic

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Government, Manufacturing (Industrial)

Article published date

2024-09-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project