logo
ProjectProject In Tender

Puerto Rico Electric Power Flexible Distributed Generation Units project

The status, timeline and source of this project. A free account opens every field.

Source: InfraPPPWorld

The project includes developing, constructing, managing and operating new mobile and/or fixed (or a combination thereof) flexible distributed generation units to be located at various locations (initially including at existing PREPA electric generation installations) across the island of Puerto Rico (the “Generation Units”), pursuant to a twenty-five year (25-year) power purchase and operating agr

Status
Under Construction
Sector
Government, Natural Gas, Power Generation (CCGT)
Location
Puerto Rico
Updated
22 Jul 2026
Source
InfraPPPWorld

ConstructChat

Ask ConstructChat about Puerto Rico Electric Power Flexible Distributed Generation Units project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Puerto Rico Electric Power Flexible Distributed Generation Units project” is an infrastructure initiative in the Government sector, located in Puerto Rico. Taiyo aggregates data on it from InfraPPPWorld.

Participants

Sponsoring Agency

Status

Original status

project in tender

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project includes developing, constructing, managing and operating new mobile and/or fixed (or a combination thereof) flexible distributed generation units to be located at various locations (initially including at existing PREPA electric generation installations) across the island of Puerto Rico (the “Generation Units”), pursuant to a twenty-five year (25-year) power purchase and operating agreement (“PPOA”) (the “Project”).The intent of the Project is to install the Generation Units to provide peaking capacity at existing sites, which provide necessary infrastructure to deploy peaking generation to support PREPA’s system reliability. The Project aims to replace PREPA’s existing, aging flexible distributed generation units so that peaking capacity continues to be available for dispatch in the near- to mid-term.The Generation Units must be capable of burning Distillate #2 fuel (diesel) and natural gas (NG), either fuel on a primary basis and without any modifications to the supplied packages.

Original sector

Energy

Location

Country

Puerto Rico

Source

Source

InfraPPPWorld

URL

More Details

Record type

Project

Sector

Government, Natural Gas, Power Generation (CCGT)

Article published date

2025-03-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project