logo

Puerto Vallarta Wastewater Plant

Sector: Water Supply and Storage • Location: Mexico

Source: World Bank Group

Project
Cancelled

In November 1994 the Puerto Vallarta Water Authority (SEAPAL-PV), Mexico, awarded a 17 year build-own-transfer contract for a sewage treatment plant to private company Compania Tratadora de Aguas Negras de Puerto Vallarta, S.A. de C.V. (CTAPV). The plant was to be built over a two year period in the municipality of Puerto Vallarta, state of Jalisco. The municipality had some of 150,000 inhabitants

Project Information FAQ

Project Information

4 Q
The project “Puerto Vallarta Wastewater Plant” is an infrastructure initiative in the Water Supply and Storage sector, located in Mexico. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

cancelled

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In November 1994 the Puerto Vallarta Water Authority (SEAPAL-PV), Mexico, awarded a 17 year build-own-transfer contract for a sewage treatment plant to private company Compania Tratadora de Aguas Negras de Puerto Vallarta, S.A. de C.V. (CTAPV). The plant was to be built over a two year period in the municipality of Puerto Vallarta, state of Jalisco. The municipality had some of 150,000 inhabitants and was a popular tourist destination. The sewage plant was designed to treat a maximum sewage flow rate of 2,500 liters per second. CTAPV was a special purpose company fully owned by Cascal, a joint venture of UK company Biwater and Dutch firm Nuon. Financial closure for the $33 million plant was reached as follows: $7 million was provided by International Finance Corporation ($5 million in senior loan and $2 million as a subordinated loan); $8 million was invested by Biwater as equity; $17 million in loans was provided by government owned BANOBRAS in the form of loans. Construction of the plant was completed in early 1995. CTAPV was paid monthly, according to the volume of water processed, at a tariff linked to the CPI to generate a real ROE of 11 percent. In September 2004 the BOT contract was canceled, and ownership of the infrastructure was transfered to municipal utility SEAPAL. An operations and maintenance contract was subsequently awarded to Cascal, but the private party no longer took on significant operational risks. None None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data