Pulaski Skyway Rehabilitation Project
Sector: Automotive • Location: New Jersey, United States of America
Source: New Jersey Department of Transportation (NJDOT)
The project is currently in Final Design and Construction. The New Manahawkin Bay Bridge construction contract was awarded on April 24, 2013 with construction activities beginning May 3, 2013. Construction is anticipated to continue through 2020. Since Route 72 is vital to the tourist economy, four lanes of traffic will be provided continuously during construction in the summer months.
transit g
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project is currently in Final Design and Construction. The New Manahawkin Bay Bridge construction contract was awarded on April 24, 2013 with construction activities beginning May 3, 2013. Construction is anticipated to continue through 2020. Since Route 72 is vital to the tourist economy, four lanes of traffic will be provided continuously during construction in the summer months. transit graphic alternate routes graphic temporary detours graphic carpools/vanpools graphic 511NJ travel info graphic newsroom graphic The traffic pattern on the Skyway will change near the Tonnele exit, as shown in this video. Vehicles heading to Tonnele Circle, Route 1&9 North and the Lincoln Tunnel must stay to the right to exit. Motorists heading to Route 139 and the Holland Tunnel must use the left lane. In addition, the Newark, Kearny, and Broadway ramps will remain closed for rehabilitation in future contracts. With the reopening of the northbound lanes on the Skyway, Route 139 lower level will resume the variable lane configuration Mondays through Fridays (except Holidays) with two lanes inbound (eastbound) and one lane outbound (westbound) in the morning and two lanes outbound (westbound) and one lane inbound (eastbound) in the afternoon and evening. Sunday afternoons and evenings also will have two inbound lanes going towards the Tunnel, with one lane outbound. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
