logo

Pulaski Skyway Rehabilitation Project

Sector: Automotive • Location: New Jersey, United States of America

Source: New Jersey Department of Transportation (NJDOT)

Project
Active

The project is currently in Final Design and Construction. The New Manahawkin Bay Bridge construction contract was awarded on April 24, 2013 with construction activities beginning May 3, 2013. Construction is anticipated to continue through 2020. Since Route 72 is vital to the tourist economy, four lanes of traffic will be provided continuously during construction in the summer months.

transit g

Project Information FAQ

Project Information

4 Q
The project “Pulaski Skyway Rehabilitation Project” is an infrastructure initiative in the Automotive sector, located in New Jersey, United States of America. Taiyo aggregates data on it from New Jersey Department of Transportation (NJDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project is currently in Final Design and Construction. The New Manahawkin Bay Bridge construction contract was awarded on April 24, 2013 with construction activities beginning May 3, 2013. Construction is anticipated to continue through 2020. Since Route 72 is vital to the tourist economy, four lanes of traffic will be provided continuously during construction in the summer months. transit graphic alternate routes graphic temporary detours graphic carpools/vanpools graphic 511NJ travel info graphic newsroom graphic The traffic pattern on the Skyway will change near the Tonnele exit, as shown in this video. Vehicles heading to Tonnele Circle, Route 1&9 North and the Lincoln Tunnel must stay to the right to exit. Motorists heading to Route 139 and the Holland Tunnel must use the left lane. In addition, the Newark, Kearny, and Broadway ramps will remain closed for rehabilitation in future contracts. With the reopening of the northbound lanes on the Skyway, Route 139 lower level will resume the variable lane configuration Mondays through Fridays (except Holidays) with two lanes inbound (eastbound) and one lane outbound (westbound) in the morning and two lanes outbound (westbound) and one lane inbound (eastbound) in the afternoon and evening. Sunday afternoons and evenings also will have two inbound lanes going towards the Tunnel, with one lane outbound.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data