logo

Pullman Gulch Union

Sector: Manufacturing (Industrial) • Location: Nashville, Tennessee, USA

Source: HKS Architects

Project
Completed

Pullman Gulch Union is a 29-story contemporary condominium tower that is part of a three-phase mixed-use development at the gateway between Downtown Nashville and The Gulch neighborhood. The project includes street-level retail, an active podium, and a variety of amenities such as a rooftop sky club with a pool, indoor-outdoor amenity terrace, fitness center, co-working lounges, and a dog park. Th

Project Information FAQ

Project Information

3 Q
The project “Pullman Gulch Union” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Nashville, Tennessee, USA. Taiyo aggregates data on it from HKS Architects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Pullman Gulch Union is a 29-story contemporary condominium tower that is part of a three-phase mixed-use development at the gateway between Downtown Nashville and The Gulch neighborhood. The project includes street-level retail, an active podium, and a variety of amenities such as a rooftop sky club with a pool, indoor-outdoor amenity terrace, fitness center, co-working lounges, and a dog park. The tower features floor-to-ceiling glass and multiple corner balconies, with a facade that pays homage to The Gulch's industrial past. The project was designed by HKS Architects and constructed by Turner Construction, with engineering support from Brockette Davis Drake, Hawkins Partners, and Catalyst Design Group. The development was led by Endeavor Real Estate Group and Long Wharf Capital. The project was completed on schedule with the first occupants moving in by July 2024.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data