Pulverize & Repave 5.5 Km
Sector: Road • Location: St John'S, NF, Canada
Source: Dodge USA
Pulverize and Repave approximately 5.5 km of Route 80, km 64.7 to km 70.2, between New Perlican and Winterton. Cold Plane and Repave approximately 1.25km of Route 70, km 48.8 to 50.05, in Victoria. Levelling approximately 0.6 km of Route 70-17, Cranes Road, km 4.8 to km 5.4. Seawall Installation and Armour Stone Placement on Route 80 in Cavendish.
- Status
- Prospective
- Sector
- Road, Commercial, Manufacturing (Industrial)
- Location
- St John'S, NF, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pulverize & Repave 5.5 Km
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Pulverize and Repave approximately 5.5 km of Route 80, km 64.7 to km 70.2, between New Perlican and Winterton. Cold Plane and Repave approximately 1.25km of Route 70, km 48.8 to 50.05, in Victoria. Levelling approximately 0.6 km of Route 70-17, Cranes Road, km 4.8 to km 5.4. Seawall Installation and Armour Stone Placement on Route 80 in Cavendish. |
Procurement method |
Location
Country | Canada |
State | NF |
City | St John'S |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Manufacturing (Industrial) |
Article published date | 2024-02-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
