Pulverizing
Sector: Commercial • Location: Medford, Wisconsin, United States of America
Source: Dodge
Pulverize the full depth of the existing asphaltic surface until 97 or more will pass the 2 50mm sieve. Also pulverize the existing base to a depth determined by the Towns to mix with the pulverized asphaltic material. Specify size of machine HP, width Bidding will be by the linear mile on varying width pavements and an additional flat rate cost for each mobilization to projects
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Pulverize the full depth of the existing asphaltic surface until 97 or more will pass the 2 50mm sieve. Also pulverize the existing base to a depth determined by the Towns to mix with the pulverized asphaltic material. Specify size of machine HP, width Bidding will be by the linear mile on varying width pavements and an additional flat rate cost for each mobilization to projects |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Commercial projects in United States of America
- 2023 Citywide Pedestrian Safety Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
- FCS Child Care Project
- Brotman Hall (BH) Suite 377 Renovation
- Fine Arts and Housing Cooling Engineering Study
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
