logo

Pump House Electrical Phase II

Sector: Water Supply and Storage • Location: Newfoundland and Labrador, Canada

Source: Infrastructure Canada

Project
Completed

Project consists of supply and installation Kohler 36kW genset to the existing Pump House for backup generator in the town of West St. Modeste. Scope of work includes construction of concrete pad, chainlink fence , connection to existing pump house panel and all associated wiring. This projects aims to provide the town with back up power to continue to supply potable water to the town during power

Status
Closed
Sector
Water Supply and Storage, Cement, Power Generation (CCGT)
Location
Newfoundland and Labrador, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Pump House Electrical Phase II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Pump House Electrical Phase II” is an infrastructure initiative in the Water Supply and Storage sector, located in Newfoundland and Labrador, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project consists of supply and installation Kohler 36kW genset to the existing Pump House for backup generator in the town of West St. Modeste. Scope of work includes construction of concrete pad, chainlink fence , connection to existing pump house panel and all associated wiring. This projects aims to provide the town with back up power to continue to supply potable water to the town during power outages.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Newfoundland and Labrador

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Power Generation (CCGT)

Article published date

2026-04-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project