logo

Pump Station 3 Replacement

Sector: Seaport • Location: Port Angeles, Washington, United States of America

Source: City of Port Angeles

Project

Pump Station 3 is located at the intersection of Marine Drive and Hill Street. Pump Station No. 3 and its 12-inch pressure sewer were constructed in 1969 as part of a project that created the cross-town collector system and the City’s first wastewater treatment plant. During a December 2018 wind storm the pump station 3 dry well flooded, submerging all equipment, rendering the Pump Station inopera

Project Information FAQ

Project Information

3 Q
The project “Pump Station 3 Replacement” is an infrastructure initiative in the Seaport sector, located in Port Angeles, Washington, United States of America. Taiyo aggregates data on it from City of Port Angeles.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Pump Station 3 is located at the intersection of Marine Drive and Hill Street. Pump Station No. 3 and its 12-inch pressure sewer were constructed in 1969 as part of a project that created the cross-town collector system and the City’s first wastewater treatment plant. During a December 2018 wind storm the pump station 3 dry well flooded, submerging all equipment, rendering the Pump Station inoperable. A temporary fix was put in place; however, it requires increased attention by City operations crews. Replacement of the pump station is the implementation of the permanent fix, and part of a multi-phase plan to increase pump station’s capacity in order to address the increasing development and expansion of its service area on the West side of Port Angeles and the Western Urbanized Growth Area. Design Phase The City of Port Angeles entered into a Professional Service Agreement with Kennedy Jenks Consultants of Seattle, Washington for Design and Construction support for the Pump Station 3 Replacement. Construction Phase The construction phase of the Pump Station 3 Replacement was competitively bid in May 2020, with Construction Schedule for the 3rd and 4th quarter of 2020. Interwest Construction, Inc, of Burlington, Washington was the low responsible bidder. This construction contract includes the following components: Disassembly of the existing pump station Installation of a pumping bypass system for use during construction Installation of a wet well mounted Smith & Loveless pump station Installation of a pump station control panel Installation of a security fence around the facility Installation of an emergency generator.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data