Pump Station 50 Reconstruction
Bid results · Georgia · Last reported Sep 2024
Source: Dodge USA
The Pump Station 50 Reconstruction Project work is composed of the construction of a stormwater pump station, installation of 2176 linear feet of 30-inch PVC stormwater force main, 22 linear feet 18-inch RCP, 87 linear feet 36-inch RCP, 33 linear feet 42-inch RCP stormwater pipe, and 36 linear feet 8-inch DIP sanitary sewer pipe, demolition of an existing stormwater pump station, abandonment/remov
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Government, Commercial
- Location
- Bridgeboro, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pump Station 50 Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Pump Station 50 Reconstruction Project work is composed of the construction of a stormwater pump station, installation of 2176 linear feet of 30-inch PVC stormwater force main, 22 linear feet 18-inch RCP, 87 linear feet 36-inch RCP, 33 linear feet 42-inch RCP stormwater pipe, and 36 linear feet 8-inch DIP sanitary sewer pipe, demolition of an existing stormwater pump station, abandonment/removal of 1765 linear feet of existing 24-inch RCP stormwater force main, and appurtenant works to co... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Bridgeboro |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Government, Commercial |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
