logo
ProjectClosed

Pump Station and Sewer Line Replacement

Closed · Tennessee · Last reported Jul 2024

Source: Dodge USA

Install approximately 745 of new gravity sanitary sewer line that includes approximately 178 of jack/bore under a TDOT State Route, 3 new manholes, tying into an existing manhole and complete demolition of an existing sewerage lift station along with code compliant termination of all utilities for the existing lift station. All work is required to be compliant with the City of Clarksville Standard

Status
Closed
Sector
Power Transmission, Water Supply and Storage, Waste Processing and Treatment, Education, Road, Commercial, Power Generation (CCGT)
Location
Clarksville, Tennessee, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Pump Station and Sewer Line Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Pump Station and Sewer Line Replacement” is an infrastructure initiative in the Power Transmission sector, located in Clarksville, Tennessee, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Install approximately 745 of new gravity sanitary sewer line that includes approximately 178 of jack/bore under a TDOT State Route, 3 new manholes, tying into an existing manhole and complete demolition of an existing sewerage lift station along with code compliant termination of all utilities for the existing lift station. All work is required to be compliant with the City of Clarksville Standard Water and Wastewater

Procurement method

Budget

Location

Country

United States of America (USA)

State

Tennessee

City

Clarksville

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Transmission, Water Supply and Storage, Waste Processing and Treatment, Education, Road, Commercial, Power Generation (CCGT)

Article published date

2024-08-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project