Pump Station Modifications
Closed · Illinois · Last reported Jul 2024
Source: Dodge USA
Scope - The Project includes Materials, Labors and Equipment for the installation of one new 49 cfs pump, including 36? discharge piping, in the spare bay of the Wood River pump station and the replacement of an existing 1 cfs pump with an 11 cfs submersible pump, including a 14? discharge and flap gate, at the Hawthorne pump station for the Wood River Levee District in Madison County, Illinois.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment
- Location
- Wood River, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pump Station Modifications
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The Project includes Materials, Labors and Equipment for the installation of one new 49 cfs pump, including 36? discharge piping, in the spare bay of the Wood River pump station and the replacement of an existing 1 cfs pump with an 11 cfs submersible pump, including a 14? discharge and flap gate, at the Hawthorne pump station for the Wood River Levee District in Madison County, Illinois. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Wood River |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
