Pump Station Replacement
Sector: Water Supply and Storage • Location: Eel Ground, New Brunswick, Canada
Source: Dodge USA
- Upgrades to the existing lagoon lift station, including but not limited to replacement of pumps and all wet well internals, construction of a wood frame structure to contain all valving and electrical equipment, SCADA integration, connections to existing infrastructure, and management of wastewater during construction.
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Commercial
- Location
- Eel Ground, New Brunswick, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pump Station Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | - Upgrades to the existing lagoon lift station, including but not limited to replacement of pumps and all wet well internals, construction of a wood frame structure to contain all valving and electrical equipment, SCADA integration, connections to existing infrastructure, and management of wastewater during construction. |
Procurement method |
Location
Country | Canada |
State | New Brunswick |
City | Eel Ground |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Commercial |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
