logo

Pump Stations Improvement: Niskey Lake 1 & 2, Rivermeade, and Highlands

Sector: Advanced Electronics • Location: Georgia, United States of America (USA)

Source: Atlanta Watershed

Project
On-Hold / Planning

The City operates and maintains unmanned remote pumping stations that convey sewage flows to the Water Reclamation Centers in areas not accessible by gravity sewers. The Department remotely monitors the pump stations seven days a week. These pump stations have safety components and telemetry equipment that must operate continuously to ensure that there will be no loss of power resulting in unsafe

Project Information FAQ

Project Information

5 Q
The project “Pump Stations Improvement: Niskey Lake 1 & 2, Rivermeade, and Highlands” is an infrastructure initiative in the Advanced Electronics sector, located in Georgia, United States of America (USA). Taiyo aggregates data on it from Atlanta Watershed.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

on-hold / planning

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The City operates and maintains unmanned remote pumping stations that convey sewage flows to the Water Reclamation Centers in areas not accessible by gravity sewers. The Department remotely monitors the pump stations seven days a week. These pump stations have safety components and telemetry equipment that must operate continuously to ensure that there will be no loss of power resulting in unsafe working conditions or sewage overflows. During inclement weather the power source to the pumping stations may be interrupted and require immediate attention from operators that must have emergency generators delivered to the site. The scope of this project includes: Installing permanent generators to ensure reliable power source Replacing gas alarm system Replacing force main pressure sensor and transmitter Replacing pump control panel and input/output (I/O) panels

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data