Pump Supply for Stade LNG Terminal
Sector: Oil and Gas • Location: Stade, Germany
Source: World Pumps
Nikkiso Clean Energy & Industrial Gases Group (Nikkiso CE&IG) has been awarded a contract to supply nearly 30 submerged motor pumps (20 low-pressure and 9 high-pressure) for the Stade LNG import terminal. The pumps will support the terminal's handling of multiple liquefied gases and are scheduled for delivery in 2026.
- Status
- Closed
- Sector
- Oil and Gas, LNG, Stadium, Manufacturing (Industrial)
- Location
- Stade, Germany
- Updated
- 22 Jul 2026
- Source
- World Pumps
ConstructChat
Ask ConstructChat about Pump Supply for Stade LNG Terminal
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Nikkiso Clean Energy & Industrial Gases Group (Nikkiso CE&IG) has been awarded a contract to supply nearly 30 submerged motor pumps (20 low-pressure and 9 high-pressure) for the Stade LNG import terminal. The pumps will support the terminal's handling of multiple liquefied gases and are scheduled for delivery in 2026. |
Original sector | Energy |
Location
Country | Germany |
City | Stade |
Source
Source | World Pumps |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, LNG, Stadium, Manufacturing (Industrial) |
Article published date | 2026-04-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
