Pumped Storage Project Assam
One of 4,294 projects Taiyo tracks in Assam.
Source: ET Energy World
A 2,700 MW Pumped Storage Project to enhance energy storage and grid stability in Assam, utilizing surplus electricity to pump water to an upper reservoir for energy storage and release during peak demand.
- Status
- Prospective
- Sector
- Energy Storage, Power Generation (CCGT), Hydro, Water Supply and Storage, Government
- Location
- Assam, India
- Updated
- 22 Jul 2026
- Source
- ET Energy World
ConstructChat
Ask ConstructChat about Pumped Storage Project Assam
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 2,700 MW Pumped Storage Project to enhance energy storage and grid stability in Assam, utilizing surplus electricity to pump water to an upper reservoir for energy storage and release during peak demand. |
Original sector | Power |
Location
Country | India |
State | Assam |
Source
Source | ET Energy World |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT), Hydro, Water Supply and Storage, Government |
Article published date | 2026-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
