Pumped Storage Technical Assistance Project
Sector: Road • Location: Indonesia
Source: World Bank
The objective of the Upper Cisokan Pumped Storage (UCPS) Power Project for Indonesia is to significantly increase the peaking capacity of the power generation system in Java-Bali in an environmentally and socially sustainable way and strengthen the institutional capacity of the project implementing entity Perusahaan Listrik Negara (PLN) in hydropower planning, development and operation. There are
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Power Generation (CCGT), Hydro, Forest Products and Packaging, Commercial, Government
- Location
- Indonesia
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about Pumped Storage Technical Assistance Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of the Upper Cisokan Pumped Storage (UCPS) Power Project for Indonesia is to significantly increase the peaking capacity of the power generation system in Java-Bali in an environmentally and socially sustainable way and strengthen the institutional capacity of the project implementing entity Perusahaan Listrik Negara (PLN) in hydropower planning, development and operation. There are three components to the project. The first component is development of the UCPS power plant: dam and appurtenant structures and access development, construction and operation of the UCPS Power Plant in West Java at the catchment of the Upper Cisokan River with an installed capacity of 1,040 MW(Megawatts), transmission lines: construction of two double circuit 500 kV transmission lines to connect the UCPS power plant to the existing Java-Bali power system at Cibinong- Saguling line provision of support for implementation of the above activities, including assistance in pre-construction engineering design, procurement, and construction management and supervision, and project administration: provision of support for project administrative activities to be conducted by the Project Implementation Unit (PIU); the second component is social and environmental impact management: land acquisition, resettlement and livelihoods restoration, and environment management; and the third component is feasibility study and preparation of basic design and bid documents for Matenggeng pumped storage power project, and related capacity building provision of support for the undertaking of a feasibility study and the preparation of basic design and bid documents for the future planned Matenggeng pumped storage project in Central Java with a planned installed capacity of approximately 880 MW, and provision of capacity building assistance to PLN for the planning, development and operation of hydropower projects, especially pumped storage hydropower projects. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Indonesia |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Power Generation (CCGT), Hydro, Forest Products and Packaging, Commercial, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project