Pumphouse #1 - Watermain Replacement - Phase II (AP-MCW-23189)
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
This project consists of watermain replacement in the LSD of Random Sound West (Northwest Brook). This is the second phase of watermain replacement on Black Brook Drive. Project includes replacement of 345 m of existing watermain with a new 76 mm diameter PVC watermain and installation of 19 water service lines.
- Status
- Under Construction
- Sector
- Water Supply and Storage, Government
- Location
- Newfoundland and Labrador, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Pumphouse 1 - Watermain Replacement - Phase II (AP-MCW-23189)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of watermain replacement in the LSD of Random Sound West (Northwest Brook). This is the second phase of watermain replacement on Black Brook Drive. Project includes replacement of 345 m of existing watermain with a new 76 mm diameter PVC watermain and installation of 19 water service lines. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
