Pumphouse Upgrade
One of 10,000+ projects Taiyo tracks in Saskatchewan.
Source: Infrastructure Canada
The existing plant needs upgrading to reduce interruptions in service, reduce pressure loss events in distribution system, and reduce boil water advisories. Construct onsite backup 25 kW power generator, pumps controls, and all associated works. Major portions of the upgraded works have a design life of 20 years.
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Government
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Pumphouse Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The existing plant needs upgrading to reduce interruptions in service, reduce pressure loss events in distribution system, and reduce boil water advisories. Construct onsite backup 25 kW power generator, pumps controls, and all associated works. Major portions of the upgraded works have a design life of 20 years. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Government |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
