Pumphouse Upgrade
Completed · Alberta
Source: Infrastructure Canada
The project includes the replacement of three (3) pumps within the pump house and the addition of an effective chlorination system and backflow pressure control valves. The project is required for the safety of residents and future growth potential.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government
- Location
- Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Pumphouse Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes the replacement of three (3) pumps within the pump house and the addition of an effective chlorination system and backflow pressure control valves. The project is required for the safety of residents and future growth potential. |
Original sector | Drinking Water and Wastewater |
Budget |
Location
Country | Canada |
State | Alberta |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
