logo

Puna Geothermal Power Plant Repower Phase 2

The status, timeline and source of this project. A free account opens every field.

Source: Industrial Info Resources

Project
Planned

Repower phase 2 of the 38-MW Puna Geothermal Power plant in Pahoa, Hawaii, replacing 12 turbines with four modern units to increase capacity to 46 MW.

Status
Prospective
Sector
Geothermal, Manufacturing (Industrial), Power Generation (CCGT), Power Transmission
Location
Pahoa, Hawaii, United States of America
Updated
22 Jul 2026
Source
Industrial Info Resources

ConstructChat

Ask ConstructChat about Puna Geothermal Power Plant Repower Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Puna Geothermal Power Plant Repower Phase 2” is an infrastructure initiative in the Geothermal sector, located in Pahoa, Hawaii, United States. Taiyo aggregates data on it from Industrial Info Resources.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Repower phase 2 of the 38-MW Puna Geothermal Power plant in Pahoa, Hawaii, replacing 12 turbines with four modern units to increase capacity to 46 MW.

Original sector

Power Generation

Location

Country

United States of America (USA)

State

Hawaii

City

Pahoa

Source

Source

Industrial Info Resources

URL

More Details

Record type

Project

Sector

Geothermal, Manufacturing (Industrial), Power Generation (CCGT), Power Transmission

Article published date

2026-07-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project