Punatsangchhu-I Hydroelectric Plant
The status, timeline and source of this project. A free account opens every field.
Source: Powerline Magazine
A 1,200 MW hydroelectric plant in Bhutan facing delays due to geological challenges, expected to be fully commissioned by 2026-27.
- Status
- Under Construction
- Sector
- Power Generation (CCGT)
- Location
- Bhutan
- Updated
- 22 Jul 2026
- Source
- Powerline Magazine
ConstructChat
Ask ConstructChat about Punatsangchhu-I Hydroelectric Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 1,200 MW hydroelectric plant in Bhutan facing delays due to geological challenges, expected to be fully commissioned by 2026-27. |
Original sector | Power Transmission |
Location
Country | Bhutan |
Source
Source | Powerline Magazine |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-12-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Bhutan
- Mangdechhu Hydroelectric Project Bhutan
- DGPC/TATA Dagacchu HPP
- Dagachhu Hydro Power Project
- Punatsangchhu-I
- Mangdechhu
- Tala Hydroelectric Project
- Punatsangchhu-II
- Evacuation of Power from Tala hydro plant in Bhutan to Delhi through Powerlinks Transmission Ltd., a JV with Power Grid Corporation of India Ltd.
